• Select your website
  • EN

Our project references

Supply Chain Management

Italy

Supply Chain Management

Altran managed the entire supplier retrofit programme for the Italian and Swiss fleets of new high-speed trains and achieved the following results:

  •     Product-conformity vs. customer on scheduled plan
  •     Non-conformity costs reduction
  •     Supplier quality improvement
Lieferqualitätskontrolle - Qualitätsprüfung

Belgium

Supplier quality control - Quality inspection

Development of the quality systems, product qualification and control methods for four cabling subcontractors.

  • Altran focused on wire-damage risks during cabling-duct assembly as well as handling and transport qualification related to special processes (crimping, torque tightening, shield connection), and with respect to fire/smoke controls, electric component homologation, railways norms and customer specifications, wire-to-wire and dielectric testing, traceability and configuration follow-up.
Design to X: Innovation

France

Design to X: Innovation-to-Mass production

7-tonne reduction in train weight.

By using innovative engineering systems methodologies Altran exceeded objectives by 20%.

France

Co-creation of services

Definition of a multimedia services package for TER (Train Express Regional) clients (launched in 2010).

Altran Prime identified 1,300 ideas, set up a service scenario corresponding to customer expectations as well as those of the organisational bodies and defined five innovative product concepts.

Railway Reference

Italy

Sustainability Management for a train manufacturer

  • Environmental Management System (ISO 14001, EMAS)
  • Health and Safety Management System (OHSAS 18001)
  • Due Diligence
  • Life-Cycle Assessment (LCA) and Environmental Product-
  • Environmental Auditing
  • Health and Safety Auditing
  • Environmental Accounting

Altran event focus

Select your website